Past Performance
PROJECT NAME : Border Road –Section III- Al Qaim / Al waleed

 


Location: Anbar, western Iraq

Project Owner :USA Corp of Engineers

(USACE) for MOI

Contract Date : AUG 10 - MAY 11

Description: J.V. with Al Raheeq Al Makhtoom Company project Description: Execution of 30KM from a border road in the western region of Iraq the width of road was 10m with shoulders 6m paving road with three layers of Asphalt also to the work was include Design & constructing 13 Concrete tubular Culverts.

PROJECT NAME : Infrastructure Improvements - Command Base Locations



Location:  Al Anbar
Project Owner : USACE

Contract Date : DEC 10 - NOV 12

Description:astructure expansion to improve and refurbish 4 locations for the Iraqi 7th Division Forward Operating Base Command Centre. This included the design and construction of several new facilities to include: water wells and treatment plants, water and wastewater networks, power generation, distribution networks,dining and medical facilities, base infrastructure and all furniture, fixtures, fittings and equipment to enable active operations to continue seamlessly.

PROJECT NAME : Iraqi Special Operations Force Command Construction



Location:  Al ASAD Air Base
Project Owner : ECCI / AFCEE

Contract Date : AUG 08 - FEB 09

Description: Construction of ISOF command centre at Al ASAD airbase for 900 Iraqi Special Operation Force Command personnel. Our scope of work on this project was for all the vertical construction and wet civil work. The project involved the construction of 19 K-Span buildings providing over 86,000 Square-foot of usable space.

PROJECT NAME : Al Nuckaib Military Compound


Location:  Al Anbar
Project Owner : TETRA-TECH/AFCEE

Contract Date : NOV 07 - MAR 08

Description: Design and build of K-Span structures for a new Iraqi Military installation. Use of ABM-120 K-Span totalling 21300 Square metres. To include cellulose insulation and the installation of doors and windows.

PROJECT NAME : Man Camp & Facility Construction Basra


Location:  Basra 

Project Owner : AlSaraf

Contract Date : DEC 10 - JAN 12

Description: Construction of a complete Man-Camp facility in support of the Oil and Gas industry - South of Iraq. Catering for 900 personnel, the Man-Camp has been designed inclusive of large maintenance and warehousing facilities.

PROJECT NAME : Akashat Camp 
 

Location:  Al-Anbar

Project Owner : USA Corp of Engineers

(USACE) to End user MOD

Contract Date : Nov10 - Oct 12

Description: The supply and installation of re-locatable buildings to accommodate US military personnel. This included the installation of HVAC and electrical fit out compatible with US electrical voltage. All buildings were pre-fabricated in Turkey and shipped to Afghanistan where they were erected. All electrical systems were flown in from overseas to meet the timescale and specification.

PROJECT NAME : Designing and construction of the temporary camp for Kogas Company


Location:  Al-Anbar

Project Owner : Kogas Company

Contract Date : Sep 13 - Jun 14

Description:Design & execution Camp the work include with dimension of project (150*100) m and consist of : (1) 16 caravans (3*12) m used as accommodation for kogas staff and 34 caravan used as offices , kitchen , dining , ablution , and weapon storage (2) four concrete bunker (3) permanent guard tower with guards room (4) two generators with two fuel tank 25000 L (5) water tank 200000 L (6) sewage treatment 100000 L (7) T-wall , Hesco and ditch fence (8) walk way & road (9) water, sewage and electrical network (10) sunshade for 10 cars and two trucks.

PROJECT NAME : Designing and construction of a warehouse


Location:  Al-Anbar

Project Owner : Kogas Company

Contract Date : May 14 - Jun 14

Description:Main Contractor (Direct Contracting) Project Description: Designing and construction of a warehouse with Dimensions (9 x 100) m from Steel Structure and Concrete pad covering by Sandwich panel & Corrugated sheets in Akkaz Gas field in Al Anbar Governorate.

PROJECT NAME : Constructition Truss for Pure Water Factory


Location:  Baghdad

Project Owner : Private Contract

Contract Date : Apr 15 - Aug 15

Description: Design and construct truss for Water purification factory from Steel Structure with Diminsions ( 130 x 41) m total high in middle 13m and at edges 9m without using Intermediate columns covering from out site by sandiwch panels with all finishing & lectrical Mecheincal works.

PROJECT NAME : Rehabilitation of Thirmiston plant belong to our Company partners with al-abid Al-Araby co. 
 
Location:  Al –Saqlawiya – Al-Anbar

Project Owner : Private Contract

Description: Thirmistone mold and pieces in all sizes, and all the raw material are local except the Aluminum Capacity of the plant: 500m3 of Thirmistone daily

PROJECT NAME : ECW Roads and Well Pads

 

Location: Al Anbar

Project Owner : KOGAS

Contract Date : JUL 13 - MAY 14

Description: Project comprised of the detailed Engineering, Procurement, Construction, Inspection and Testing of Road Way and Well Pad construction - Upgrading of main access road to CPF area; construction of new access roads to gathering hubs. Total distance of paved roads inclusive of hard shoulder, line marking and sign posting = 15km. Route included the construction of 20 mixed Box and Pipe Culverts and checkpoints. Project incorporated the construction of 3 Well Pads (85x32m) each consisting of 8 excavated cellars for gas drilling operations.

PROJECT NAME : Piers & Dredging, Umm Qasr, Iraq

Location: Umm Qaser/ Basrah

Project Owner : USA Corps of Engineers to MOD

Contract Date : 1-6-2016 ongoing

Description:  Piers & Dredging, Umm Qasr, The project is executing in JV with Al-Nafath Company, the work supervision by USA Corps of Engineers, The work include execution of the dredging works to three disposal box with total volume 659310 M3,Fuel Station shade toal area 2100 m2 with provision of nine fuel Tanks & two Water tank with capacity 100,000 Litter for each oneconnection with Pumps through pipes work to the pier also to electrical works.

PROJECT NAME : Provision of Commuting Bussing Services (Logistic Project)

Location: Majnoon oil Field / Basrah

Project Owner : Shell Petroleum Company

Contract Date : 1-12-2016 Ongoing

Description:   Provision& Rental of buses with total quantity (24) bus for the transporting Shell Staff from Majnoon oil field to Basra province and Conversely four of these buss is Toyota type castor 24 Set & eighteen is Toyota type Hiace 14 set.

A- Project Name :

Processing of submersible pumps, solar-powered name.

Client: Ministry of Water Resources - General Authority of groundwater.

B- Project Name:

The establishment of a solar generator to equip schools with electricity.

Client: Baghdad Governorate Council

Under consideration

Name of Project: Establishment of a solar generator to feed the station April

9 NAHRAWAN electric power.

Client: Ministry of Water Resources